ASDSO Dam Safety Toolbox

Initial Reservoir Filling and Surveillance Record

From ASDSO Dam Safety Toolbox
Jump to: navigation, search

"An initial reservoir filling and surveillance plan should be prepared by the design staff. Initial filling should be well documented, including a record of reservoir elevations and controlled water releases during the filling. The record should include complete written justification and design approval of any deviations from the planned filling. The surveillance record should include all information obtained from inspection of the dam, appurtenant structures, abutments, and reservoir rim during the initial filling." [1]


Citations:


Revision ID: 5612
Revision Date: 12/14/2022