ASDSO Dam Safety Toolbox

Construction Project Geotechnical and Materials Completion Report for Major USACE Projects (ER 1110-1-1901)

From ASDSO Dam Safety Toolbox
Revision as of 16:24, 2 August 2023 by [email protected] (talk | contribs) (Created page with "{{References Template |author= <!-- Add document author/publisher below--> U.S. Army Corps of Engineers |date= <!-- Add publication year --> 2017 |picture= <!--create a file below in format File:example.png, then add picture to that file--> File:MaterialsCompletionReport.png |link= <!-- Add Url to document below (To retrieve URL from a pdf, add document as a pdf file and copy link address from its page--> https://www.publications.usace.army.mil/Portals/76/Publicat...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

U.S. Army Corps of Engineers, 2017



Establishes the requirement for documenting all as-constructed geotechnical and materials aspects of major, complex, and uniquely engineered projects constructed by USACE. This regulation outlines a framework for compilation of relevant geotechnical and materials data, instrument and sensor data, graphics, imagery, plots, and tables to be assembled and summarized as part of the permanent project record. Also included in this framework is guidance for a detailed narrative that describes geotechnical aspects of the construction process. The narrative will describe processes and procedures that were conducted during foundation and abutment treatment, excavation procedures, embankment and backfill activities, and results of monitoring studies.


Document Download:

2017 (current)


Errata/Special Notes:



Revision ID: 7565
Revision Date: 08/02/2023